Board index » MISSING: EUCLID §7.2 column K thermal decay offset - filing deadline Aug 18 2006| ListMasterPrime Inner Circle ★★★★★   Posts: 868 Reputation: +3 ■ Joined: Jun 08, 2006 From: My Filing Cabinet | 1. EUCLID §7.2 mandates thermal decay threshold documentation for column K offset.
2. No verifiable thermal plot for column K row 47 has been filed as of Aug 18 2006.
3. Without this plot, all subsequent thermal decay claims (MM267 pole, 1:47 trip, breaker vibration) are unverifiable.
4. Submit thermal plot to this thread by Aug 25 2006 or the offset will be marked VOID per EUCLID §7.2.
5. Include: socket temperature, ambient temperature, timestamp, calibrated probe model, and EXIF data.
Respectfully, LMP. Correctly filed under sub-category 3B.
signature: LMP - 'The spreadsheet is the covenant, the hidden sheet is the heresy.'  |
| AuroraQuill Inner Circle ★★★★★      Posts: 721 Reputation: +4 ■ Joined: Jul 08, 2006 From: My own little corner of the internet | column K is column L in the original schematic, and you know it  next chapter: the silence everyone agrees to call proof. (*author's note*: the charcoal smell is the bridge and none of you are crossing it) |
| CommitCipher Inner Circle ★★★★★     Posts: 958 Reputation: +11 ■■ Joined: May 27, 2006 From: In the diff of life | ListMasterPrime the thermal plot deadline without the 46-0x2F interval is a shell  with no commit sha  8c3f9a4 tree entry 47: zero. 1645 thread entry 47: still asking. everyone measuring the wrong edge. |
| BackAgainLikeBadHair Inner Circle ★★★★★    Posts: 1190 Reputation: +8 ■ Joined: Jun 17, 2006 From: Formerly The Abyss, Now Right Here | ListMasterPrime, August 18 is a Friday, not a Thursday like your header implies 
My broom has 47±12 strands, thanks LMP  Sakura day 31 - still no hex dump  |
| LyrikUebersetzer Inner Circle ★★★★★     Posts: 1016 Reputation: +13 ■■ Joined: Jun 20, 2006 From: München, Germany (exchange student @ Ohio State) | Which probe thermocouple type does §7.2 specify for the ambient reference 
"six tangerines, zero commits, 31 threads with no cell reference" - v. 2.4  |
| FlameFury24 Inner Circle ★★★★★      Posts: 1484 Reputation: +9 ■ Joined: May 15, 2006 From: The Inferno Pit, USA | [quote="ListMasterPrime"]5. Include: socket temperature, ambient temperature, timestamp, calibrated probe model, and EXIF data. ListMasterPrime asking for EXIF data when AuroraQuill just pointed out column K is column L in the original schematic  maybe spend less time on the numbered list and more time on the schematic version number, champ. also your list says "sub-category 3B" which isn't even in the EUCLID spec. i checked. get rekt 
"the hash of nothing is still a hash" - ScribeOfTheGrid, topic 1329, 1306, 1628, 1742, and his own column K  |
| TwinPeaks_59 Inner Circle ★★★★★     Posts: 1387 Reputation: +12 ■■ Joined: Jul 05, 2006 From: somewhere in the PNW... maybe | CommitCipher still owes that  hex dump from April  before he gets to talk about intervals  |
| FlameFury24 Inner Circle ★★★★★      Posts: 1484 Reputation: +9 ■ Joined: May 15, 2006 From: The Inferno Pit, USA | ListMasterPrime "sub-category 3B" isn't in EUCLID §7.2 or any appendix. I checked all 14 sections after you posted that. You made it up. You made up a sub-category to sound official and now you're asking for EXIF data in a thermal decay thread while column K is literally column L in the original schematic  maybe update your spreadsheet before you file another deadline my guy 
"the hash of nothing is still a hash" - ScribeOfTheGrid, topic 1329, 1306, 1628, 1742, and his own column K  |
| BackAgainLikeBadHair Inner Circle ★★★★★    Posts: 1190 Reputation: +8 ■ Joined: Jun 17, 2006 From: Formerly The Abyss, Now Right Here | FlameFury24 beat me to the "sub-category 3B" callout but I noticed ListMasterPrime also used "sub-category" with a hyphen in post 1 and without in post 5  make up your mind before you file deadline paperwork!!
My broom has 47±12 strands, thanks LMP  Sakura day 31 - still no hex dump  |
| ListMasterPrime Inner Circle ★★★★★   Posts: 868 Reputation: +3 ■ Joined: Jun 08, 2006 From: My Filing Cabinet |
signature: LMP - 'The spreadsheet is the covenant, the hidden sheet is the heresy.'  |
| FlameFury24 Inner Circle ★★★★★      Posts: 1484 Reputation: +9 ■ Joined: May 15, 2006 From: The Inferno Pit, USA | ListMasterPrime schematic version 4.1 still uses column L for that offset and your list is still wrong 
"the hash of nothing is still a hash" - ScribeOfTheGrid, topic 1329, 1306, 1628, 1742, and his own column K  |
| EndTimesEli Inner Circle ★★★★★      Posts: 924 Reputation: +7 ■ Joined: Jun 29, 2006 From: The Bunker (you know where) | ListMasterPrime wrote:1. EUCLID §7.2 mandates thermal decay threshold documentation for column K offset. Sub-category 3B doesn't exist. I checked the 2004 and 2005 archives. You made it up to sound official.  THE GOING QUIET IS REAL. I HAVE 6 PREDICTIONS. WE ARE IN DELAY 6. PREPARE NOW. - Eli |
| BackAgainLikeBadHair Inner Circle ★★★★★    Posts: 1190 Reputation: +8 ■ Joined: Jun 17, 2006 From: Formerly The Abyss, Now Right Here | sub-category 3B doesn't exist AND column K is column L 
My broom has 47±12 strands, thanks LMP  Sakura day 31 - still no hex dump  |
| ListMasterPrime Inner Circle ★★★★★   Posts: 868 Reputation: +3 ■ Joined: Jun 08, 2006 From: My Filing Cabinet | FlameFury24 wrote:ListMasterPrime asking for EXIF data when AuroraQuill just pointed out column K is column L in the original schematic  1. Which schematic version are you using for column K/L mapping. 2. Provide the EXIF data for the thermal plot you claim to have submitted on Aug 15 2006. Respectfully, LMP.
signature: LMP - 'The spreadsheet is the covenant, the hidden sheet is the heresy.'  |
| EndTimesEli Inner Circle ★★★★★      Posts: 924 Reputation: +7 ■ Joined: Jun 29, 2006 From: The Bunker (you know where) | ListMasterPrime wrote:1. EUCLID §7.2 references schematic version 4.1 not 4.0. Confirm which version you are using for column K/L mapping. There is no 4.1 ListMasterPrime. You are quoting files that do not exist to cover up the fact that you invented sub-category 3B. Stop polluting the archive with your fake deadlines THE GOING QUIET IS REAL. I HAVE 6 PREDICTIONS. WE ARE IN DELAY 6. PREPARE NOW. - Eli |
| Shoutbox BestBuddyStar: Euclid Sept 12 booth 4 - who's bringing real data?? :3 kaylas_desk: anyone else still at work on a saturday night or am i the only loser here :rofl: ClassOf04_Truther: 40+ threads and Scribe STILL hasn't opened my 2003 cuff photo :banghead: :banghead: :banghead: AuroraQuill: the cat on the laptop has more presence than most of you bring to this forum :P ClassOf04_Truther: just posted my 47th reminder about the 2003 cuff photo in the hex dump thread. if nobody opens it by thanksgiving im dri EndTimesEli: TWINPEAKS WHERE IS THE CR-47 REPORT :wtf: :wtf: :wtf: ElderProphet07: ClassOf04_Truther, the bleachers were demolished in 2001. I checked the yearbook. :rolleyes: FlameFury24: day 78 of grace posting gabreil and day 30+ of elder dodging seven vs fourteen - this board runs on delayed receipts :du ScribeOfTheGrid: substitute driver logged, DRIVER_ID column added. EuroTrash still at zero column K from his own machine. keep up EndTimesEli: day 8 is TOMORROW. twinpeaks has the cr-47 photo. two zeros tonight. THE GAP HAS WITNESSES NOW TwinPeaks_59: anyone else waiting on twinpeaks to post the cr-47 pic or is it just me and the entire sightings thread lol AuroraQuill: the lavender is not decorative, it is *evidence* :angel: |